Best Residential Design 2014 for OVO, Pune | Design for Clariant headquaters wins Archi Design Award 2014 | Amongst the AD most influential 50 in architecture | M Auditorium wins Interior Design Best Institutional : Theater | Planet 3 Studios on Dezeen and Archdaily |
   
Works & People |  About Us |  Publications | Talks |  Videos  
Design-Build |  Awards |  Competitions | Blog |  Contact Us  
 
 

    Design-Build Singular Responsibility        List
 
With both design and construction in our hands as single entity, we are the sole point of responsibility for quality, cost and schedule adherence. We are motivated to deliver a successful project by fulfilling multiple parallel objectives including aesthetic and functional quality, budget and a schedule for timely completion. We ensure that the administrative burden and the time spent by the client on project performance are minimized. Critically, Design-build enables superior risk management for the client. Implicit in the Design-build process is a client's shelter from liability. We as architects and constructors take sole-responsibility for any design errors or omissions, and thereby prevent typical litigation problems inherent in Design-Bid-Build.





Introduction

Singular Responsibility

Time Saving Advantage

Cost Saving Advantage

Superior Quality Control

Design Innovation

Crisis Management

Post Completion Service

DBIA Industry Partnership





 


About Us | Works & People | Awards | Publications | Competitions | Design-Build | Talks | Videos | Links | Career | Online Shop
Contact Us | Sitemap
Other Links
Copyright ® 2010-2024 planet3studios.com. All Rights Reserved.

Designed by DreamSoft IT Solutions Pvt. Ltd.
FaceBook.com Linkedin.com Twiter.com YouTube.com MySpace.com Google Bookmarks Orkut.com