Planet 3 Studios was recently listed in the 'Fab 50' list by Architects and Interiors India magazine amongst people who have the power to change the face of the country :: Recently completed 50,000 sft. Syntel Office at Airoli, Navi Mumbai :: Planet 3 studios won the 'Best Young Designer Award of the Year 2010' at 'CSI Award Event , by Snowcem Paints' at Mumbai :: In the year 2010, Planet 3 Studios won the Archi Design Awards for Best Institutional Building, Archi Design Awards for best Hospitality project, IAD Awards for Excellence in Interiors & Architecture Designs as Best Interior Designer and Emerging interior design practice by IIID+ MK, National Award :: 'Design Matrix' magazine published Kalhan & Santha and Planet 3 Studios as its cover story for its March Issue :: 'Out of the box' workstation got launched at Jaipur and is now available in market ::
An ISO 9001-2008 Certified Company  
Works & People |  About Us |  Publications | Talks |  Videos  
Design-Build |  Awards |  Competitions | Blog |  Contact Us  
 

    Design-Build Post Completion Service        List
 
Our commitment to the facility does not end with project delivery. We provide comprehensive on-site support and warranties for all installed components. This is possible due to the quality and standards that we employ during construction and the availability of skilled workmen with that particular site work-experience. Our post-occupancy studies have provided us quantifiable data that helps us design and deliver sustainable solutions with lower life cycle costs.

The most definitive study on design-build cost effectiveness is Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build (Construction Industry Institute Research Report 133-11, April 1998).

Authors Victor Sanvido and Mark Konchar analyze survey data from 351 construction projects. The authors concluded that the design-build performance compared favorably to the design-bid-build performance; the unit cost was six per cent less, construction time was 12 percent faster, and project time (design and construction) was 33 percent faster.



Introduction

Singular Responsibility

Time Saving Advantage

Cost Saving Advantage

Superior Quality Control

Design Innovation

Crisis Management

Post Completion Service

DBIA Industry Partnership





 


About Us | Works & People | Awards | Publications | Competitions | Design-Build | Talks | Videos | Links | Career | Online Shop
Contact Us | Sitemap
Other Links
Copyright ® 2010 planet3studios.com. All Rights Reserved.

Designed by DreamSoft IT Solutions Pvt. Ltd.
FaceBook.com Linkedin.com Twiter.com YouTube.com MySpace.com Google Bookmarks Orkut.com