    Design-Build Time Saving Advantage        List
 
With Design-Build, we are able to get on ground sooner, build faster and deliver before schedule more often than comparable Design-Bid-Build deliveries. The initial time saving is in elimination of the bid phase between design and construction. We are able to save further by overlapping design and construction activities. Materials, equipment procurement and construction on site can be initiated well before preparation of all specific details documents. The integrated process approach encourages time saving value engineering and parallel construction activities that do not get into each other's way. Most importantly, due to the better control that we exert over the various component agencies working on the project, any delays or non-performance can be addressed quickly and effectively without getting into contractual issues and time wasting procedures, making Design-Build the system of choice for 'Fast-Track' deliveries.



Introduction

Singular Responsibility

Time Saving Advantage

Cost Saving Advantage

Superior Quality Control

Design Innovation

Crisis Management

Post Completion Service

DBIA Industry Partnership

Client Feedback



 

Copyright ® 2008 planet3studios.com. All Rights Reserved.